HTS Heading 0603
Cut flowers and flower buds of a kind suitable for bouquets or for ornamental purposes, fresh, dried, dyed, bleached, impregnated or otherwise prepared
All 35 HTS codes under heading 0603 (cut flowers), with their duty rates from the 2026 HTS Revision 23. General duty 3.2% to 6.8%.
Every line of heading 0603
- 0603 Cut flowers and flower buds of a kind suitable for bouquets or for ornamental purposes, fresh, dried, dyed, bleached, impregnated or otherwise prepared.
- 0603.11.00 Roses (under: Fresh): General 6.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 0603.11.00.30 Spray (under: Roses) (No.).
- 0603.11.00.50 Other (under: Roses) (No.).
- 0603.12 Carnations (under: Fresh).
- 0603.12.30.00 Miniature (spray) carnations (under: Carnations) (No.): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 0603.12.70.00 Other (under: Carnations) (No.): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.2% (JP); Column 2 40%.
- 0603.13.00 Orchids (under: Fresh): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.2% (JP); Column 2 40%.
- 0603.13.00.50 Dendrobium (under: Orchids) (No.).
- 0603.13.00.60 Other (under: Orchids) (No.).
- 0603.14.00 Chrysanthemums (under: Fresh): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.2% (JP); Column 2 40%.
- 0603.14.00.10 Pom Pom (under: Chrysanthemums) (No.).
- 0603.14.00.20 Other (under: Chrysanthemums) (No.).
- 0603.15.00.00 Lilies (Lillium spp.) (under: Fresh) (No.): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.2% (JP); Column 2 40%.
- 0603.19.01 Other (under: Fresh): General 6.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.2% (JP); Column 2 40%.
- 0603.19.01.05 Anthuriums (under: Other) (No.).
- 0603.19.01.07 Alstroemeria (under: Other) (No.).
- 0603.19.01.09 Aster (under: Other) (No.).
- 0603.19.01.11 Bells of Ireland (under: Other) (No.).
- 0603.19.01.13 Bird of Paradise (under: Other) (No.).
- 0603.19.01.14 Calla lilies (under: Other) (No.).
- 0603.19.01.15 Daffodils (under: Other) (No.).
- 0603.19.01.16 Delphinium (under: Other) (No.).
- 0603.19.01.17 Freesia (under: Other) (No.).
- 0603.19.01.18 Gerbera (under: Other) (No.).
- 0603.19.01.19 Gladiolus (under: Other) (No.).
- 0603.19.01.20 Gypsophila (under: Other) (No.).
- 0603.19.01.25 Hydrangea (under: Other) (No.).
- 0603.19.01.27 Hypericum (under: Other) (No.).
- 0603.19.01.29 Lisianthus (under: Other) (No.).
- 0603.19.01.31 Peony (under: Other) (No.).
- 0603.19.01.35 Ranunculus (under: Other) (No.).
- 0603.19.01.37 Scabiosa (under: Other) (No.).
- 0603.19.01.40 Snapdragons (under: Other) (No.).
- 0603.19.01.41 Statice (under: Other) (No.).
- 0603.19.01.42 Stock (under: Other) (No.).
- 0603.19.01.43 Sunflowers (under: Other) (No.).
- 0603.19.01.45 Tulips (under: Other) (No.).
- 0603.19.01.55 Campanula (under: Other) (No.).
- 0603.19.01.97 Other (under: Other) (No.).
- 0603.90.00.00 Other (under: Cut flowers and flower buds of a kind suitable for bouquets or for ornamental purposes, fresh, dried, dyed, bleached, impregnated or otherwise prepared) (No.): General 4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.