HTS Heading 0604
Foliage, branches and other parts of plants, without flowers or flower buds, and grasses, mosses and lichens, being goods of a kind suitable for bouquets or for ornamental purposes, fresh, dried, dyed, bleached, impregnated or otherwise prepared
All 17 HTS codes under heading 0604 (foliage, branches and other parts of plants), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7%.
Every line of heading 0604
- 0604 Foliage, branches and other parts of plants, without flowers or flower buds, and grasses, mosses and lichens, being goods of a kind suitable for bouquets or for ornamental purposes, fresh, dried, dyed, bleached, impregnated or otherwise prepared.
- 0604.20.00 Fresh (under: Foliage, branches and other parts of plants, without flowers or flower buds, and grasses, mosses and lichens, being goods of a kind suitable for bouquets or for ornamental purposes, fresh, dried, dyed, bleached, impregnated or otherwise prepared): General Free; Special none; Column 2 Free.
- 0604.20.00.05 Aralia (under: Fresh) (No.).
- 0604.20.00.11 Aspidistra (under: Fresh) (No.).
- 0604.20.00.15 Eucalyptus (under: Fresh) (No.).
- 0604.20.00.20 Douglas fir (under: Evergreen Christmas trees) (No.).
- 0604.20.00.40 Fir except Douglas fir (under: Evergreen Christmas trees) (No.).
- 0604.20.00.60 Other (under: Evergreen Christmas trees) (No.).
- 0604.20.00.65 Leather leaf (under: Ferns) (No.).
- 0604.20.00.70 Other (under: Ferns) (No.).
- 0604.20.00.72 Mosses and lichens (under: Fresh) (No.).
- 0604.20.00.74 Chamadorea (under: Palms) (No.).
- 0604.20.00.78 Other (under: Palms) (No.).
- 0604.20.00.82 Pittosporum (under: Fresh) (No.).
- 0604.20.00.84 Ruscus (under: Fresh) (No.).
- 0604.20.00.86 Other (under: Fresh) (No.).
- 0604.90 Other (under: Foliage, branches and other parts of plants, without flowers or flower buds, and grasses, mosses and lichens, being goods of a kind suitable for bouquets or for ornamental purposes, fresh, dried, dyed, bleached, impregnated or otherwise prepared).
- 0604.90.10.00 Mosses and lichens (under: Other) (No.): General Free; Special none; Column 2 Free.
- 0604.90.30.00 Dried or bleached (under: Other) (No.): General Free; Special none; Column 2 Free.
- 0604.90.60.00 Other (under: Other) (No.): General 7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.