HTS Heading 0701
Potatoes, fresh or chilled
All 14 HTS codes under heading 0701 (potatoes, fresh or chilled), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 0701
- 0701 Potatoes, fresh or chilled.
- 0701.10.00 Seed (under: Potatoes, fresh or chilled): General 0.5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 1.7¢/kg.
- 0701.10.00.20 In immediate containers of not over 45 kg net weight (kg).
- 0701.10.00.40 Other (under: Seed) (kg).
- 0701.90 Other (under: Potatoes, fresh or chilled).
- 0701.90.10 Yellow (Solano) potatoes (under: Other): General 0.5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.7¢/kg.
- 0701.90.10.10 Certified organic (under: Yellow (Solano) potatoes) (kg).
- 0701.90.10.60 Other (under: Yellow (Solano) potatoes) (kg).
- 0701.90.50 Other (under: Other): General 0.5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 1.7¢/kg.
- 0701.90.50.05 Certified organic (under: In immediate containers of not over 1200 kg net weight) (kg).
- 0701.90.50.17 Russet or netted gem varieties (kg).
- 0701.90.50.21 Red skin varieties (under: In immediate containers of not over 1200 kg net weight) (kg).
- 0701.90.50.37 White varieties (under: In immediate containers of not over 1200 kg net weight) (kg).
- 0701.90.50.41 Other (under: In immediate containers of not over 1200 kg net weight) (kg).
- 0701.90.50.43 Certified organic (under: Other) (kg).
- 0701.90.50.46 Russet or netted gem varieties (kg).
- 0701.90.50.56 Red skin varieties (under: Other) (kg).
- 0701.90.50.66 White varieties (under: Other) (kg).
- 0701.90.50.76 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.