HTS Heading 0703

Onions, shallots, garlic, leeks and other alliaceous vegetables, fresh or chilled

All 17 HTS codes under heading 0703 (onions, shallots, garlic), with their duty rates from the 2026 HTS Revision 23. General duty Free to 20%, some per unit.

Every line of heading 0703

  • 0703 Onions, shallots, garlic, leeks and other alliaceous vegetables, fresh or chilled.
  • 0703.10 Onions and shallots (under: Onions, shallots, garlic, leeks and other alliaceous vegetables, fresh or chilled).
  • 0703.10.20.00 Onion sets (under: Onions and shallots) (kg): General 0.83¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
  • 0703.10.30.00 Pearl onions not over 16 mm in diameter (kg): General 0.96¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
  • 0703.10.40 Other (under: Other): General 3.1¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
  • 0703.10.40.25 Onions (under: Certified organic) (kg).
  • 0703.10.40.45 Other (under: Certified organic) (kg).
  • 0703.10.40.55 Red varieties (under: Onions) (kg).
  • 0703.10.40.60 White varieties (under: Onions) (kg).
  • 0703.10.40.64 Yellow varieties, not marked sweet (kg).
  • 0703.10.40.66 Yellow varieties, marked sweet (kg).
  • 0703.10.40.68 Other (under: Onions) (kg).
  • 0703.10.40.70 Shallots (under: Other) (kg).
  • 0703.10.40.75 Other (under: Other) (kg).
  • 0703.20.00 Garlic (under: Onions, shallots, garlic, leeks and other alliaceous vegetables, fresh or chilled): General 0.43¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.3¢/kg.
  • 0703.20.00.05 Certified organic (under: Fresh whole bulbs) (kg).
  • 0703.20.00.15 Other (under: Fresh whole bulbs) (kg).
  • 0703.20.00.20 Fresh whole peeled cloves (under: Garlic) (kg).
  • 0703.20.00.90 Other (under: Garlic) (kg).
  • 0703.90.00 Leeks and other alliaceous vegetables: General 20%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 0703.90.00.20 Green onions of a species other than Allium cepa (kg).
  • 0703.90.00.40 Other (under: Leeks and other alliaceous vegetables) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.