HTS Heading 0704

Cabbages, cauliflower, kohlrabi, kale and similar edible brassicas, fresh or chilled

All 13 HTS codes under heading 0704 (cabbages, cauliflower), with their duty rates from the 2026 HTS Revision 23. General duty Free to 20%, some per unit.

Every line of heading 0704

  • 0704 Cabbages, cauliflower, kohlrabi, kale and similar edible brassicas, fresh or chilled.
  • 0704.10 Cauliflowers and broccoli (Brassica oleracea var. botrytis).
  • 0704.10.20.00 If entered during the period from June 5 to October 15, inclusive, in any year (kg): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 0704.10.40.00 Not reduced in size (under: Other) (kg): General 10%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 0704.10.60.00 Cut, sliced or otherwise reduced in size (kg): General 14%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0704.20.00 Brussels sprouts (under: Cabbages, cauliflower, kohlrabi, kale and similar edible brassicas, fresh or chilled): General 12.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 0704.20.00.20 Certified organic (under: Brussels sprouts) (kg).
  • 0704.20.00.40 Other (under: Brussels sprouts) (kg).
  • 0704.90 Other (including sprouting broccoli (Brassica oleracea var. italica)).
  • 0704.90.20.00 Cabbage (under: Other (including sprouting broccoli (Brassica oleracea var. italica))) (kg): General 0.54¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
  • 0704.90.40 Other (under: Other (including sprouting broccoli (Brassica oleracea var. italica))): General 20%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 0704.90.40.15 Bok choy (under: Other) (kg).
  • 0704.90.40.22 Certified organic (under: Broccoli) (kg).
  • 0704.90.40.24 Other (under: Broccoli) (kg).
  • 0704.90.40.28 Collards (under: Other) (kg).
  • 0704.90.40.35 Kale (under: Other) (kg).
  • 0704.90.40.45 Napa cabbage (under: Other) (kg).
  • 0704.90.40.55 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.