HTS Heading 0706
Carrots, turnips, salad beets (salad beetroot), salsify, celeriac, radishes and similar edible roots, fresh or chilled
All 8 HTS codes under heading 0706 (carrots, turnips), with their duty rates from the 2026 HTS Revision 23. General duty Free to 14.9%, some per unit.
Every line of heading 0706
- 0706 Carrots, turnips, salad beets (salad beetroot), salsify, celeriac, radishes and similar edible roots, fresh or chilled.
- 0706.10 Carrots and turnips (under: Carrots, turnips, salad beets (salad beetroot), salsify, celeriac, radishes and similar edible roots, fresh or chilled).
- 0706.10.05.00 Reduced in size (under: Carrots) (kg): General 14.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0706.10.10.00 Under 10 cm in length (under: Other) (kg): General 1.4¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17.6¢/kg.
- 0706.10.20.00 Other (under: Other) (kg): General 0.7¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 8.8¢/kg.
- 0706.10.40.00 Turnips (under: Carrots and turnips) (kg): General Free; Special none; Column 2 0.6¢/kg.
- 0706.90 Other (under: Carrots, turnips, salad beets (salad beetroot), salsify, celeriac, radishes and similar edible roots, fresh or chilled).
- 0706.90.20.00 Radishes (under: Other) (kg): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 0706.90.30.00 Beets and horseradish (under: Other) (kg): General 1.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12%.
- 0706.90.40 Other (under: Other): General 10%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 0706.90.40.20 Celeriac (under: Other) (kg).
- 0706.90.40.40 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.