HTS Heading 0705

Lettuce (Lactuca sativa) and chicory (Cichorium spp.), fresh or chilled

All 12 HTS codes under heading 0705 (lettuce (Lactuca sativa)), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 0705

  • 0705 Lettuce (Lactuca sativa) and chicory (Cichorium spp.), fresh or chilled.
  • 0705.11 Head lettuce (cabbage lettuce).
  • 0705.11.20.00 If entered in the period from June 1 to October 31, inclusive, in any year (kg): General 0.4¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
  • 0705.11.40.00 Other (under: Head lettuce (cabbage lettuce)) (kg): General 3.7¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
  • 0705.19 Other (under: Lettuce).
  • 0705.19.20 If entered in the period from June 1 to October 31, inclusive, in any year: General 0.4¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
  • 0705.19.20.20 Romaine lettuce (under: If entered in the period from June 1 to October 31, inclusive, in any year) (kg).
  • 0705.19.20.40 Butterhead lettuce (under: If entered in the period from June 1 to October 31, inclusive, in any year) (kg).
  • 0705.19.20.60 Red and green leaf lettuce (under: If entered in the period from June 1 to October 31, inclusive, in any year) (kg).
  • 0705.19.20.80 Other (under: If entered in the period from June 1 to October 31, inclusive, in any year) (kg).
  • 0705.19.40 Other (under: Other): General 3.7¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
  • 0705.19.40.20 Romaine lettuce (under: Other) (kg).
  • 0705.19.40.40 Butterhead lettuce (under: Other) (kg).
  • 0705.19.40.60 Red and green leaf lettuce (under: Other) (kg).
  • 0705.19.40.80 Other (under: Other) (kg).
  • 0705.21.00.00 Witloof chicory (Cichorium intybus var. foliosum) (kg): General 0.15¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
  • 0705.29.00.00 Other (under: Chicory) (kg): General 0.15¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.