HTS Heading 0710
Vegetables (uncooked or cooked by steaming or boiling in water), frozen
All 39 HTS codes under heading 0710 (vegetables), with their duty rates from the 2026 HTS Revision 23. General duty Free to 14.9%, some per unit.
Every line of heading 0710
- 0710 Vegetables (uncooked or cooked by steaming or boiling in water), frozen.
- 0710.10.00.00 Potatoes (under: Vegetables (uncooked or cooked by steaming or boiling in water), frozen) (kg): General 14%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0710.21 Peas (Pisum sativum) (under: Leguminous vegetables, shelled or unshelled).
- 0710.21.20.00 If entered during the period from July 1 to September 30, inclusive, in any year (kg): General 1¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.6¢/kg.
- 0710.21.40.00 Other (under: Peas (Pisum sativum)) (kg): General 2¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.6¢/kg.
- 0710.22 Beans (Vigna spp., Phaseolus spp.).
- 0710.22.10.00 If entered during the period from November 1 in any year to the following May 31, inclusive (kg): General 2.3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.7¢/kg.
- 0710.22.15.00 Other (under: Lima beans) (kg): General 4.9¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.7¢/kg.
- 0710.22.20.00 Cowpeas (other than black-eye peas) (kg): General Free; Special none; Column 2 Free.
- 0710.22.25.00 String beans (snap beans) (under: Not reduced in size) (kg): General 4.9¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.7¢/kg.
- 0710.22.37.00 Other (under: Not reduced in size) (kg): General 4.9¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR, MA,OM,P,PA,PE,S, SG); Column 2 7.7¢/kg.
- 0710.22.40 Reduced in size (under: Beans (Vigna spp., Phaseolus spp.)): General 11.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0710.22.40.10 Green and wax (under: Reduced in size) (kg).
- 0710.22.40.90 Other (under: Reduced in size) (kg).
- 0710.29 Other (under: Leguminous vegetables, shelled or unshelled).
- 0710.29.05.00 Chickpeas (garbanzos) (under: Other) (kg): General 1¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
- 0710.29.15.00 Lentils (under: Other) (kg): General 0.1¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.1¢/kg.
- 0710.29.25.00 If entered during the period from July 1 to September 30, inclusive, in any year (kg): General Free; Special none; Column 2 8.6¢/kg.
- 0710.29.30.00 Other (under: Pigeon peas) (kg): General 0.8¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.6¢/kg.
- 0710.29.40.00 Other (under: Other) (kg): General 3.5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 7.7¢/kg.
- 0710.30.00.00 Spinach, New Zealand spinach and orache spinach (garden spinach) (kg): General 14%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0710.40.00.00 Sweet corn (under: Vegetables (uncooked or cooked by steaming or boiling in water), frozen) (kg): General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0710.80 Other vegetables (under: Vegetables (uncooked or cooked by steaming or boiling in water), frozen).
- 0710.80.15.00 Bamboo shoots and water chestnuts, other than Chinese water chestnuts (kg): General Free; Special none; Column 2 35%.
- 0710.80.20.00 Mushrooms (under: Other vegetables) (kg): General 5.7¢/kg + 8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22¢/kg + 45%.
- 0710.80.40.00 If entered during the period from March 1 to July 14, inclusive, or the period from September 1 to November 14, inclusive, in any year (kg): General 2.9¢/kg; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
- 0710.80.45.00 If entered during the period from July 15 to August 31, inclusive, in any year (kg): General 2.1¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 6.6¢/kg.
- 0710.80.50.00 If entered during the period from November 15 in any year to the last day of the following February, inclusive (kg): General 2.1¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
- 0710.80.60.00 Fiddlehead greens (under: Not reduced in size) (kg): General 8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 0710.80.65.00 Brussels sprouts (under: Not reduced in size) (kg): General 12.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 0710.80.70 Other (under: Not reduced in size): General 11.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 0710.80.70.40 Carrots (under: Other) (kg).
- 0710.80.70.60 Other (under: Other) (kg).
- 0710.80.85.00 Brussels sprouts (under: Reduced in size) (kg): General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0710.80.93.00 Okra (under: Reduced in size) (kg): General 14.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0710.80.97 Other (under: Reduced in size): General 14.9%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0710.80.97.10 Asparagus (under: Other) (kg).
- 0710.80.97.22 Spears (under: Broccoli) (kg).
- 0710.80.97.23 Certified organic (under: In containers each holding more than 1.4 kg) (kg).
- 0710.80.97.25 Other (under: In containers each holding more than 1.4 kg) (kg).
- 0710.80.97.26 Other (under: Other) (kg).
- 0710.80.97.30 Cauliflower (under: Other) (kg).
- 0710.80.97.55 Garlic, reduced in size beyond the clove, whether or not individually quick frozen (kg).
- 0710.80.97.65 Other (under: Other) (kg).
- 0710.90 Mixtures of vegetables (under: Vegetables (uncooked or cooked by steaming or boiling in water), frozen).
- 0710.90.11.00 Mixtures of pea pods and water chestnuts, other than Chinese water chestnuts (kg): General 7.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0710.90.91 Other (under: Mixtures of vegetables): General 14%; Special Free (A,AU,BH, CL,CO,D,E,IL, JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0710.90.91.20 Certified organic (under: Other) (kg).
- 0710.90.91.40 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.