HTS Heading 0711
Vegetables provisionally preserved, but unsuitable in that state for immediate consumption
All 12 HTS codes under heading 0711 (vegetables provisionally preserved), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8%.
Every line of heading 0711
- 0711 Vegetables provisionally preserved, but unsuitable in that state for immediate consumption.
- 0711.20 Olives (under: Vegetables provisionally preserved, but unsuitable in that state for immediate consumption).
- 0711.20.18.00 Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions (kg): General 3.7¢/kg on drained weight; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.4¢/kg on drained weight.
- 0711.20.28.00 Other (under: Green in color, in a saline solution, in containers each holding more than 8 kg, drained weight, certified by the importer to be used for repacking or sale as green olives) (kg): General 5.9¢/kg on drained weight; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.4¢/kg on drained weight.
- 0711.20.38.00 Other (under: Not pitted) (kg): General 5.9¢/kg on drained weight; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 7.4¢/kg on drained weight.
- 0711.20.40.00 Pitted or stuffed (under: Olives) (kg): General 8.6¢/kg on drained weight; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM, P,PA, PE,S,SG); Column 2 10.8¢/kg on drained weight.
- 0711.40.00.00 Cucumbers including gherkins (under: Vegetables provisionally preserved, but unsuitable in that state for immediate consumption) (kg): General 7.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0711.51.00.00 Mushrooms of the genus Agaricus (kg): General 5.7¢/kg on drained weight + 8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22¢/kg on drained weight+45%.
- 0711.59 Other (under: Mushrooms and truffles).
- 0711.59.10.00 Mushrooms (under: Other) (kg): General 5.7¢/kg on drained weight +8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22¢/kg on drained weight+45%.
- 0711.59.90.00 Other (under: Other) (kg): General 7.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0711.90 Other vegetables; mixtures of vegetables.
- 0711.90.20.00 Leguminous vegetables (under: Other vegetables; mixtures of vegetables) (kg): General Free; Special none; Column 2 6.6¢/kg.
- 0711.90.30.00 Capers (under: Other vegetables; mixtures of vegetables) (kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 0711.90.50.00 Onions (under: Other vegetables; mixtures of vegetables) (kg): General 5.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0711.90.65.00 Other vegetables; mixtures of vegetables (kg): General 7.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.