HTS Heading 0801
Coconuts, Brazil nuts and cashew nuts, fresh or dried, whether or not shelled or peeled
All 8 HTS codes under heading 0801 (coconuts, Brazil nuts and cashew nuts), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 0801
- 0801 Coconuts, Brazil nuts and cashew nuts, fresh or dried, whether or not shelled or peeled.
- 0801.11.00.00 Desiccated (under: Coconuts) (kg): General Free; Special none; Column 2 7.7¢/kg.
- 0801.12.00.00 In the inner shell (endocarp) (kg): General Free; Special none; Column 2 7.7¢/kg.
- 0801.19.01 Other (under: Coconuts): General Free; Special none; Column 2 7.7¢/kg.
- 0801.19.01.20 In shell (under: Other) (kg).
- 0801.19.01.40 Shelled (under: Other) (kg).
- 0801.21.00.00 In shell (under: Brazil nuts) (kg): General Free; Special none; Column 2 9.9¢/kg.
- 0801.22.00.00 Shelled (under: Brazil nuts) (kg): General Free; Special none; Column 2 9.9¢/kg.
- 0801.31.00.00 In shell (under: Cashew nuts) (kg): General Free; Special none; Column 2 4.4¢/kg.
- 0801.32.00.00 Shelled (under: Cashew nuts) (kg): General Free; Special none; Column 2 4.4¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.