HTS Heading 0802
Other nuts, fresh or dried, whether or not shelled or peeled
All 25 HTS codes under heading 0802 (other nuts, fresh or dried), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 0802
- 0802 Other nuts, fresh or dried, whether or not shelled or peeled.
- 0802.11.00.00 In shell (under: Almonds) (kg): General 7.7¢/kg; Special Free (A+,AU,BH, CL,CO,D,E,IL, JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 12.1¢/kg.
- 0802.12.00 Shelled (under: Almonds): General 24¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 40.8¢/kg.
- 0802.12.00.05 Certified organic (under: Shelled) (kg).
- 0802.12.00.15 Other (under: Shelled) (kg).
- 0802.21.00.00 In shell (under: Hazelnuts or filberts (Corylus spp.)) (kg): General 7¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 0802.22.00.00 Shelled (under: Hazelnuts or filberts (Corylus spp.)) (kg): General 14.1¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 22¢/kg.
- 0802.31.00.00 In shell (under: Walnuts) (kg): General 7¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 0802.32.00.00 Shelled (under: Walnuts) (kg): General 26.5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33.1¢/kg.
- 0802.41.00.00 In shell (under: Chestnuts (Castanea spp.)) (kg): General Free; Special none; Column 2 Free.
- 0802.42.00.00 Shelled (under: Chestnuts (Castanea spp.)) (kg): General Free; Special none; Column 2 Free.
- 0802.51.00.00 In shell (under: Pistachios) (kg): General 0.9¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
- 0802.52.00.00 Shelled (under: Pistachios) (kg): General 1.9¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 0802.61.00.00 In shell (under: Macadamia nuts) (kg): General 1.3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
- 0802.62.00.00 Shelled (under: Macadamia nuts) (kg): General 5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg.
- 0802.70.10.00 In shell (under: Kola nuts (Cola spp.)) (kg): General 1.3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
- 0802.70.20.00 Shelled (under: Kola nuts (Cola spp.)) (kg): General 5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 0802.80.10.00 In shell (under: Areca nuts) (kg): General 1.3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
- 0802.80.20.00 Shelled (under: Areca nuts) (kg): General 5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg.
- 0802.91 Pine nuts, in shell (under: Other).
- 0802.91.10.00 Pignolia (under: Pine nuts, in shell) (kg): General 0.7¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
- 0802.91.90.00 Other (under: Pine nuts, in shell) (kg): General 1.3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
- 0802.92 Pine nuts, shelled (under: Other).
- 0802.92.10.00 Pignolia (under: Pine nuts, shelled) (kg): General 1¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 0802.92.90.00 Other (under: Pine nuts, shelled) (kg): General 5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg.
- 0802.99 Other (under: Other).
- 0802.99.10.00 In shell (under: Pecans) (kg): General 8.8¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg.
- 0802.99.15.00 Shelled (under: Pecans) (kg): General 17.6¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22¢/kg.
- 0802.99.82.00 In shell (under: Other) (kg): General 1.3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
- 0802.99.98.00 Shelled (under: Other) (kg): General 5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.