HTS Heading 0805

Citrus fruit, fresh or dried

All 19 HTS codes under heading 0805 (citrus fruit), with their duty rates from the 2026 HTS Revision 23. General duty Free to 0.8%, some per unit.

Every line of heading 0805

  • 0805 Citrus fruit, fresh or dried.
  • 0805.10.00 Oranges (under: Citrus fruit, fresh or dried): General 1.9¢/kg; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 2.2¢/kg.
  • 0805.10.00.20 Temple oranges (under: Oranges) (kg).
  • 0805.10.00.50 Certified organic (under: Other) (kg).
  • 0805.10.00.60 Other (under: Other) (kg).
  • 0805.21.00 Mandarins (including tangerines and satsumas): General 1.9¢/kg; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 2.2¢/kg.
  • 0805.21.00.10 Tangerines (under: Mandarins (including tangerines and satsumas)) (kg).
  • 0805.21.00.90 Other (under: Mandarins (including tangerines and satsumas)) (kg).
  • 0805.22.00.00 Clementines (under: Mandarins (including tangerines and satsumas); clementines, wilkings and similar citrus hybrids) (kg): General 1.9¢/kg; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 2.2¢/kg.
  • 0805.29.00.00 Other (under: Mandarins (including tangerines and satsumas); clementines, wilkings and similar citrus hybrids) (kg): General 1.9¢/kg; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 2.2¢/kg.
  • 0805.40 Grapefruit and pomelos (under: Citrus fruit, fresh or dried).
  • 0805.40.40 If entered during the period from August 1 to September 30, inclusive, in any year: General 1.9¢/kg; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.3¢/kg.
  • 0805.40.40.10 Grapefruit (under: If entered during the period from August 1 to September 30, inclusive, in any year) (kg).
  • 0805.40.40.90 Pomelo (under: If entered during the period from August 1 to September 30, inclusive, in any year) (kg).
  • 0805.40.60 If entered during the month of October: General 1.5¢/kg; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.3¢/kg.
  • 0805.40.60.10 Grapefruit (under: If entered during the month of October) (kg).
  • 0805.40.60.90 Pomelo (under: If entered during the month of October) (kg).
  • 0805.40.80 If entered at any other time (under: Grapefruit and pomelos): General 2.5¢/kg; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.3¢/kg.
  • 0805.40.80.10 Grapefruit (under: If entered at any other time) (kg).
  • 0805.40.80.90 Pomelo (under: If entered at any other time) (kg).
  • 0805.50 Lemons (Citrus limon, Citrus limonum) and limes (Citrus aurantifolia, Citrus latifolia).
  • 0805.50.20 Lemons (under: Lemons (Citrus limon, Citrus limonum) and limes (Citrus aurantifolia, Citrus latifolia)): General 2.2¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 5.5¢/kg.
  • 0805.50.20.10 Certified organic (under: Lemons) (kg).
  • 0805.50.20.50 Other (under: Lemons) (kg).
  • 0805.50.30 Tahitian limes, Persian limes and other limes of the Citrus latifolia variety (kg): General 0.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0805.50.30.20 Certified organic (under: Tahitian limes, Persian limes and other limes of the Citrus latifolia variety) (kg).
  • 0805.50.30.40 Other (under: Tahitian limes, Persian limes and other limes of the Citrus latifolia variety) (kg).
  • 0805.50.40.00 Other (under: Limes) (kg): General 1.8¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
  • 0805.90.01.00 Other, including kumquats, citrons and bergamots (kg): General 0.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.