HTS Heading 0804
Dates, figs, pineapples, avocados, guavas, mangoes and mangosteens, fresh or dried
All 27 HTS codes under heading 0804 (dates, figs, pineapples), with their duty rates from the 2026 HTS Revision 23. General duty Free to 29.8%, some per unit.
Every line of heading 0804
- 0804 Dates, figs, pineapples, avocados, guavas, mangoes and mangosteens, fresh or dried.
- 0804.10 Dates (under: Dates, figs, pineapples, avocados, guavas, mangoes and mangosteens, fresh or dried).
- 0804.10.20 Packed in units weighing (with the immediate container, if any) not more than 4.6 kg: General 13.2¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 16.5¢/kg.
- 0804.10.20.10 Certified organic (under: Packed in units weighing (with the immediate container, if any) not more than 4.6 kg) (kg).
- 0804.10.20.90 Other (under: Packed in units weighing (with the immediate container, if any) not more than 4.6 kg) (kg).
- 0804.10.40.00 With pits (under: Other) (kg): General 1¢/kg; Special Free (A,AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 2.2¢/kg.
- 0804.10.60.00 With pits removed (under: Other) (kg): General 2.8¢/kg; Special Free (A,AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
- 0804.10.80.00 Other (under: Dates) (kg): General 29.8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0804.20 Figs (under: Dates, figs, pineapples, avocados, guavas, mangoes and mangosteens, fresh or dried).
- 0804.20.40.00 In immediate containers weighing with their contents over 0.5 kg each (kg): General 7.9¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg.
- 0804.20.60.00 Other (under: Whole) (kg): General 6.2¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 0804.20.80.00 Other (under: Figs) (kg): General 8.8¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 0804.30 Pineapples (under: Dates, figs, pineapples, avocados, guavas, mangoes and mangosteens, fresh or dried).
- 0804.30.20.00 In bulk (under: Not reduced in size) (kg): General 0.51¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 0.64¢/kg.
- 0804.30.40 In crates or other packages (under: Not reduced in size): General 1.1¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 2.11¢/kg.
- 0804.30.40.10 Certified organic (under: In crates or other packages) (kg).
- 0804.30.40.90 Other (under: In crates or other packages) (kg).
- 0804.30.60 Reduced in size (under: Pineapples): General 0.44¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 4.4¢/kg.
- 0804.30.60.10 Certified organic (under: Reduced in size) (kg).
- 0804.30.60.90 Other (under: Reduced in size) (kg).
- 0804.40.00 Avocados (under: Dates, figs, pineapples, avocados, guavas, mangoes and mangosteens, fresh or dried): General 11.2¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33.1¢/kg.
- 0804.40.00.20 Certified organic (under: Hass avocados and avocados determined by the Secretary of Agriculture to be Hass-like) (kg).
- 0804.40.00.40 Other (under: Hass avocados and avocados determined by the Secretary of Agriculture to be Hass-like) (kg).
- 0804.40.00.90 Other (under: Avocados) (kg).
- 0804.50 Guavas, mangoes and mangosteens.
- 0804.50.40 If entered during the period from September 1, in any year, to the following May 31, inclusive: General 6.6¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33.1¢/kg.
- 0804.50.40.45 Certified organic (under: Mangoes) (kg).
- 0804.50.40.55 Other (under: Mangoes) (kg).
- 0804.50.40.65 Mangosteens (under: If entered during the period from September 1, in any year, to the following May 31, inclusive) (kg).
- 0804.50.40.75 Other (under: If entered during the period from September 1, in any year, to the following May 31, inclusive) (kg).
- 0804.50.60 If entered at any other time (under: Fresh): General 6.6¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33.1¢/kg.
- 0804.50.60.45 Certified organic (under: Mangoes) (kg).
- 0804.50.60.55 Other (under: Mangoes) (kg).
- 0804.50.60.65 Mangosteens (under: If entered at any other time) (kg).
- 0804.50.60.75 Other (under: If entered at any other time) (kg).
- 0804.50.80 Dried (under: Guavas, mangoes and mangosteens): General 1.5¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33.1¢/kg.
- 0804.50.80.20 Certified organic (under: Mangoes) (kg).
- 0804.50.80.40 Other (under: Mangoes) (kg).
- 0804.50.80.90 Other (under: Dried) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.