HTS Heading 0811

Fruit and nuts, uncooked or cooked by steaming or boiling in water, frozen, whether or not containing added sugar or other sweetening matter

All 30 HTS codes under heading 0811 (fruit and nuts), with their duty rates from the 2026 HTS Revision 23. General duty Free to 14.5%, some per unit.

Every line of heading 0811

  • 0811 Fruit and nuts, uncooked or cooked by steaming or boiling in water, frozen, whether or not containing added sugar or other sweetening matter.
  • 0811.10.00 Strawberries (under: Fruit and nuts, uncooked or cooked by steaming or boiling in water, frozen, whether or not containing added sugar or other sweetening matter): General 11.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0811.10.00.20 In immediate containers each holding not more than 1.2 liters (kg).
  • 0811.10.00.50 Not more than 25 percent by weight (kg).
  • 0811.10.00.60 More than 25 percent by weight (kg).
  • 0811.10.00.75 Certified organic (under: Other) (kg).
  • 0811.10.00.85 Other (under: Other) (kg).
  • 0811.20 Raspberries, blackberries, mulberries, loganberries, black, white or red currants and gooseberries (other than kiwi fruit).
  • 0811.20.20 Raspberries, loganberries, black currants and gooseberries (other than kiwi fruit): General 4.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0811.20.20.25 Red Raspberries (under: Raspberries) (kg).
  • 0811.20.20.35 Other (under: Raspberries) (kg).
  • 0811.20.20.40 Other (under: Raspberries, loganberries, black currants and gooseberries (other than kiwi fruit)) (kg).
  • 0811.20.40 Other (under: Raspberries, blackberries, mulberries, loganberries, black, white or red currants and gooseberries (other than kiwi fruit)): General 9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0811.20.40.30 Blackberries (under: Other) (kg).
  • 0811.20.40.90 Other (under: Other) (kg).
  • 0811.90 Other (under: Fruit and nuts, uncooked or cooked by steaming or boiling in water, frozen, whether or not containing added sugar or other sweetening matter).
  • 0811.90.10.00 Bananas and plantains (under: Other) (kg): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0811.90.20 Blueberries (under: Other): General Free; Special none; Column 2 35%.
  • 0811.90.20.25 Certified organic (under: Wild) (kg).
  • 0811.90.20.27 Other (under: Wild) (kg).
  • 0811.90.20.30 Certified organic (under: Cultivated (Including highbush)) (kg).
  • 0811.90.20.40 Other (under: Cultivated (Including highbush)) (kg).
  • 0811.90.22.00 Boysenberries (under: Other) (kg): General 11.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0811.90.25.00 Cashew apples, mameyes colorados, sapodillas, soursops and sweetsops (kg): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0811.90.30.00 Coconut meat (under: Other) (kg): General Free; Special none; Column 2 4.9¢/kg.
  • 0811.90.35.00 Cranberries (Vaccinium macrocarpum) (kg): General Free; Special none; Column 2 35%.
  • 0811.90.40.00 Papayas (under: Other) (kg): General 11.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0811.90.50 Pineapples (under: Other): General 0.25¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
  • 0811.90.50.10 Certified organic (under: Pineapples) (kg).
  • 0811.90.50.90 Other (under: Pineapples) (kg).
  • 0811.90.52 Mangoes (under: Other): General 10.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0811.90.52.10 Certified organic (under: Mangoes) (kg).
  • 0811.90.52.90 Other (under: Mangoes) (kg).
  • 0811.90.55.00 Melons (under: Other) (kg): General 11.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0811.90.80 Other (under: Other): General 14.5%; Special Free (A+,AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0811.90.80.40 Sweet varieties (under: Cherries) (kg).
  • 0811.90.80.60 Tart varieties (under: Cherries) (kg).
  • 0811.90.80.85 Frozen mixes only of combinations of strawberries, blueberries, red raspberries or blackberries (kg).
  • 0811.90.80.90 Peaches (under: Other) (kg).
  • 0811.90.80.97 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.