HTS Heading 0812

Fruit and nuts provisionally preserved, but unsuitable in that state for immediate consumption

All 7 HTS codes under heading 0812 (fruit and nuts), with their duty rates from the 2026 HTS Revision 23. General duty Free to 11.2%, some per unit.

Every line of heading 0812

  • 0812 Fruit and nuts provisionally preserved, but unsuitable in that state for immediate consumption.
  • 0812.10.00.00 Cherries (under: Fruit and nuts provisionally preserved, but unsuitable in that state for immediate consumption) (kg): General 13.4¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20.9¢/kg.
  • 0812.90 Other (under: Fruit and nuts provisionally preserved, but unsuitable in that state for immediate consumption).
  • 0812.90.10.00 Mixtures of two or more fruits (kg): General 11.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0812.90.20.00 Citrus (under: Other) (kg): General 1.8¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 4.4¢/kg.
  • 0812.90.30.00 Figs (under: Other) (kg): General 2.6¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 11¢/kg.
  • 0812.90.40.00 Pineapples (under: Other) (kg): General 0.25¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 4.4¢/kg.
  • 0812.90.50.00 Strawberries (under: Other) (kg): General 0.8¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 2.8¢/kg.
  • 0812.90.90.00 Other (under: Other) (kg): General 0.1¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 1.1¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.