HTS Heading 0814

Peel of citrus fruit or melons (including watermelons), fresh, frozen, dried or provisionally preserved in brine, in sulfur water or in other preservative solutions

All 3 HTS codes under heading 0814 (peel of citrus fruit or melons), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 0814

  • 0814.00 Peel of citrus fruit or melons (including watermelons), fresh, frozen, dried or provisionally preserved in brine, in sulfur water or in other preservative solutions.
  • 0814.00.10.00 Orange or citron (under: Peel of citrus fruit or melons (including watermelons), fresh, frozen, dried or provisionally preserved in brine, in sulfur water or in other preservative solutions) (kg): General Free; Special none; Column 2 4.4¢/kg.
  • 0814.00.40.00 Lime (under: Peel of citrus fruit or melons (including watermelons), fresh, frozen, dried or provisionally preserved in brine, in sulfur water or in other preservative solutions) (kg): General 1.6¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
  • 0814.00.80.00 Other (under: Peel of citrus fruit or melons (including watermelons), fresh, frozen, dried or provisionally preserved in brine, in sulfur water or in other preservative solutions) (kg): General 1.6¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 4.4¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.