HTS Heading 0813
Fruit, dried, other than that of headings 0801 to 0806; mixtures of nuts or dried fruits of this chapter
All 18 HTS codes under heading 0813 (fruit, dried), with their duty rates from the 2026 HTS Revision 23. General duty Free to 14%, some per unit.
Every line of heading 0813
- 0813 Fruit, dried, other than that of headings 0801 to 0806; mixtures of nuts or dried fruits of this chapter.
- 0813.10.00.00 Apricots (under: Fruit, dried, other than that of headings 0801 to 0806; mixtures of nuts or dried fruits of this chapter) (kg): General 1.8¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
- 0813.20 Prunes (under: Fruit, dried, other than that of headings 0801 to 0806; mixtures of nuts or dried fruits of this chapter).
- 0813.20.10.00 Soaked in brine and dried (under: Prunes) (kg): General 2¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 4.4¢/kg.
- 0813.20.20 Other (under: Prunes): General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0813.20.20.10 Dried, whether or not pitted (under: Other) (kg).
- 0813.20.20.90 Other (under: Other) (kg).
- 0813.30.00.00 Apples (under: Fruit, dried, other than that of headings 0801 to 0806; mixtures of nuts or dried fruits of this chapter) (kg): General 0.74¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
- 0813.40 Other fruit (under: Fruit, dried, other than that of headings 0801 to 0806; mixtures of nuts or dried fruits of this chapter).
- 0813.40.10.00 Papayas (under: Other fruit) (kg): General 1.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0813.40.15.00 Barberries (under: Berries) (kg): General 3.5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 5.5¢/kg.
- 0813.40.20 Other (under: Berries): General 1.4¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5.5¢/kg.
- 0813.40.20.10 Wild blueberries (under: Other) (kg).
- 0813.40.20.20 Cultivated (including highbush) blueberries (kg).
- 0813.40.20.60 Other (under: Other) (kg).
- 0813.40.30 Cherries (under: Other fruit): General 10.6¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.2¢/kg.
- 0813.40.30.10 Tart varieties(Prunus cerasus) (kg).
- 0813.40.30.90 Other (under: Cherries) (kg).
- 0813.40.40.00 Peaches (under: Other fruit) (kg): General 1.4¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 4.4¢/kg.
- 0813.40.80.00 Tamarinds (under: Other fruit) (kg): General 6.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0813.40.90.00 Other (under: Other fruit) (kg): General 2.5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 35%.
- 0813.50.00 Mixtures of nuts or dried fruits of this chapter: General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 0813.50.00.20 Containing only fruit (under: Mixtures of nuts or dried fruits of this chapter) (kg).
- 0813.50.00.40 Containing only nuts (under: Mixtures of nuts or dried fruits of this chapter) (kg).
- 0813.50.00.60 Other (under: Mixtures of nuts or dried fruits of this chapter) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.