HTS Heading 0908

Nutmeg, mace and cardamoms

All 7 HTS codes under heading 0908 (nutmeg, mace and cardamoms), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 0908

  • 0908 Nutmeg, mace and cardamoms.
  • 0908.11.00.00 Neither crushed nor ground (under: Nutmeg) (kg): General Free; Special none; Column 2 Free.
  • 0908.12.00.00 Crushed or ground (under: Nutmeg) (kg): General Free; Special none; Column 2 Free.
  • 0908.21.00.00 Neither crushed nor ground (under: Mace) (kg): General Free; Special none; Column 2 Free.
  • 0908.22 Crushed or ground (under: Mace).
  • 0908.22.20.00 Bombay or wild mace, ground (under: Crushed or ground) (kg): General 7.4¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 49¢/kg.
  • 0908.22.40.00 Other (under: Crushed or ground) (kg): General Free; Special none; Column 2 Free.
  • 0908.31.00.00 Neither crushed nor ground (under: Cardamoms) (kg): General Free; Special none; Column 2 Free.
  • 0908.32.00.00 Crushed or ground (under: Cardamoms) (kg): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.