HTS Heading 0909
Seeds of anise, badian, fennel, coriander, cumin or caraway; juniper berries
All 6 HTS codes under heading 0909 (seeds of anise, badian, fennel), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 0909
- 0909 Seeds of anise, badian, fennel, coriander, cumin or caraway; juniper berries.
- 0909.21.00.00 Neither crushed nor ground (under: Seeds of coriander) (kg): General Free; Special none; Column 2 Free.
- 0909.22.00.00 Crushed or ground (under: Seeds of coriander) (kg): General Free; Special none; Column 2 Free.
- 0909.31.00.00 Neither crushed nor ground (under: Seeds of cumin) (kg): General Free; Special none; Column 2 Free.
- 0909.32.00.00 Crushed or ground (under: Seeds of cumin) (kg): General Free; Special none; Column 2 Free.
- 0909.61.00.00 Neither crushed nor ground (under: Seeds of anise, badian, caraway or fennel; juniper berries) (kg): General Free; Special none; Column 2 Free.
- 0909.62.00.00 Crushed or ground (under: Seeds of anise, badian, caraway or fennel; juniper berries) (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.