HTS Heading 1101
Wheat or meslin flour
All 5 HTS codes under heading 1101 (wheat or meslin flour), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 1101
- 1101.00.00 Wheat or meslin flour: General 0.7¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 2.3¢/kg.
- 1101.00.00.10 Hard spring wheat (under: Wheat or meslin flour) (kg).
- 1101.00.00.20 Durum wheat (under: Wheat or meslin flour) (kg).
- 1101.00.00.30 White winter wheat (under: Wheat or meslin flour) (kg).
- 1101.00.00.50 Certified organic (under: Other) (kg).
- 1101.00.00.60 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.