HTS Heading 1102
Cereal flours other than of wheat or meslin
All 6 HTS codes under heading 1102 (cereal flours), with their duty rates from the 2026 HTS Revision 23. General duty Free to 12.8%, some per unit.
Every line of heading 1102
- 1102 Cereal flours other than of wheat or meslin.
- 1102.20.00.00 Corn (maize) flour (under: Cereal flours other than of wheat or meslin) (kg): General 0.3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.1¢/kg.
- 1102.90 Other (under: Cereal flours other than of wheat or meslin).
- 1102.90.20.00 Buckwheat flour (under: Other) (kg): General Free; Special none; Column 2 1.1¢/kg.
- 1102.90.25.00 Rice flour (under: Other) (kg): General 0.09¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.4¢/kg.
- 1102.90.27.00 Rye flour (under: Other) (kg): General 0.23¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 1¢/kg.
- 1102.90.30.00 Mixtures (under: Other) (kg): General 12.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1102.90.60.00 Other (under: Other) (kg): General 9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.