HTS Heading 1104
Cereal grains otherwise worked (for example, hulled, rolled, flaked, pearled, sliced or kibbled), except rice of heading 1006; germ of cereals, whole, rolled, flaked or ground
All 9 HTS codes under heading 1104 (cereal grains otherwise), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.5%, some per unit.
Every line of heading 1104
- 1104 Cereal grains otherwise worked (for example, hulled, rolled, flaked, pearled, sliced or kibbled), except rice of heading 1006; germ of cereals, whole, rolled, flaked or ground.
- 1104.12.00 Of oats (under: Rolled or flaked grains): General 1.2¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.8¢/kg.
- 1104.12.00.10 Certified organic (under: Of oats) (kg).
- 1104.12.00.90 Other (under: Of oats) (kg).
- 1104.19 Of other cereals (under: Rolled or flaked grains).
- 1104.19.10.00 Of barley (under: Of other cereals) (kg): General 2¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 4.4¢/kg.
- 1104.19.90.00 Other (under: Of other cereals) (kg): General 0.45¢/kg; Special Free (A,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 1¢/kg.
- 1104.22.00.00 Of oats (under: Other worked grains (for example, hulled, pearled, sliced or kibbled)) (kg): General 0.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11%.
- 1104.23.00.00 Of corn (maize) (under: Other worked grains (for example, hulled, pearled, sliced or kibbled)) (kg): General 0.45¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1¢/kg.
- 1104.29 Of other cereals (under: Other worked grains (for example, hulled, pearled, sliced or kibbled)).
- 1104.29.10.00 Of barley (under: Of other cereals) (kg): General 1.2%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 17%.
- 1104.29.90.00 Other (under: Of other cereals) (kg): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1104.30.00.00 Germ of cereals, whole, rolled, flaked or ground (kg): General 4.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.