HTS Heading 1103

Cereal groats, meal and pellets

All 9 HTS codes under heading 1103 (cereal groats), with their duty rates from the 2026 HTS Revision 23. General duty Free to 9%, some per unit.

Every line of heading 1103

  • 1103 Cereal groats, meal and pellets.
  • 1103.11.00 Of wheat (under: Groats and meal): General 0.5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 2.3¢/kg.
  • 1103.11.00.20 Semolina (under: Of wheat) (kg).
  • 1103.11.00.40 Other (under: Of wheat) (kg).
  • 1103.13.00 Of corn (maize) (under: Groats and meal): General 0.3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.1¢/kg.
  • 1103.13.00.20 Cornmeal (under: Of corn (maize)) (kg).
  • 1103.13.00.60 Other (under: Of corn (maize)) (kg).
  • 1103.19 Of other cereals (under: Groats and meal).
  • 1103.19.12.00 Of oats (under: Of other cereals) (kg): General 0.8¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.8¢/kg.
  • 1103.19.14.00 Of rice (under: Of other cereals) (kg): General 0.09¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.4¢/kg.
  • 1103.19.90.00 Of other cereals (under: Of other cereals) (kg): General 9%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 20%.
  • 1103.20.00 Pellets (under: Cereal groats, meal and pellets): General Free; Special none; Column 2 10%.
  • 1103.20.00.10 Of wheat (under: Pellets) (kg).
  • 1103.20.00.90 Of other cereals (under: Pellets) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.