HTS Heading 1108
Starches; inulin
All 10 HTS codes under heading 1108 (starches), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.6%, some per unit.
Every line of heading 1108
- 1108 Starches; inulin.
- 1108.11.00 Wheat starch (under: Starches): General 0.54¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.3¢/kg.
- 1108.11.00.10 For food use (under: Wheat starch) (kg).
- 1108.11.00.90 Other (under: Wheat starch) (kg).
- 1108.12.00 Corn (maize) starch (under: Starches): General 0.54¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.3¢/kg.
- 1108.12.00.10 For food use (under: Corn (maize) starch) (kg).
- 1108.12.00.90 Other (under: Corn (maize) starch) (kg).
- 1108.13.00 Potato starch (under: Starches): General 0.56¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 5.5¢/kg.
- 1108.13.00.10 For human consumption (under: Potato starch) (kg).
- 1108.13.00.90 Other (under: Potato starch) (kg).
- 1108.14.00.00 Cassava (manioc) starch (under: Starches) (kg): General Free; Special none; Column 2 Free.
- 1108.19.00 Other starches (under: Starches): General Free; Special none; Column 2 Free.
- 1108.19.00.10 Cereal starches for non-food use (kg).
- 1108.19.00.90 Other (under: Other starches) (kg).
- 1108.20.00.00 Inulin (under: Starches; inulin) (kg): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.