HTS Heading 1212

Locust beans, seaweeds and other algae, sugar beet and sugar cane, fresh, chilled, frozen or dried, whether or not ground; fruit stones and kernels and other vegetable products (including unroasted chicory roots of the variety Cichorium intybus sativum) of a kind used primarily for human consumption, not elsewhere specified or included

All 9 HTS codes under heading 1212 (locust beans), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 1212

  • 1212 Locust beans, seaweeds and other algae, sugar beet and sugar cane, fresh, chilled, frozen or dried, whether or not ground; fruit stones and kernels and other vegetable products (including unroasted chicory roots of the variety Cichorium intybus sativum) of a kind used primarily for human consumption, not elsewhere specified or included.
  • 1212.21.00.00 Fit for human consumption (under: Seaweeds and other algae) (kg): General Free; Special none; Column 2 Free.
  • 1212.29.00.00 Other (under: Seaweeds and other algae) (kg): General Free; Special none; Column 2 Free.
  • 1212.91.00.00 Sugar beet (under: Other) (t): General 39.7¢/t; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 88.2¢/t.
  • 1212.92.00.00 Locust beans (carob) (under: Other) (kg): General Free; Special none; Column 2 4.4¢/kg.
  • 1212.93.00.00 Sugar cane (under: Other) (t): General $1.24/t; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $2.76/t.
  • 1212.94.00.00 Chicory roots (under: Other) (kg): General Free; Special none; Column 2 4.4¢/kg.
  • 1212.99 Other (under: Other).
  • 1212.99.20.00 Nectarine (under: Apricot, peach (including nectarine) or plum stones and kernels) (kg): General Free; Special none; Column 2 4.4¢/kg.
  • 1212.99.30.00 Other (under: Apricot, peach (including nectarine) or plum stones and kernels) (kg): General 1.5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 6.6¢/kg.
  • 1212.99.92.00 Other (under: Other) (kg): General Free; Special none; Column 2 4.4¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.