HTS Heading 1213

Cereal straw and husks, unprepared, whether or not chopped, ground, pressed or in the form of pellets

The HTS code under heading 1213 (cereal straw and husks, unprepared), with its duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 1213

  • 1213.00.00.00 Cereal straw and husks, unprepared, whether or not chopped, ground, pressed or in the form of pellets (t): General Free; Special none; Column 2 $1.65/t.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.