HTS Heading 1214
Rutabagas (swedes), mangolds, fodder roots, hay, alfalfa (lucerne), clover, sainfoin, forage kale, lupines, vetches and similar forage products, whether or not in the form of pellets
All 10 HTS codes under heading 1214 (rutabagas (swedes), mangolds), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.4%.
Every line of heading 1214
- 1214 Rutabagas (swedes), mangolds, fodder roots, hay, alfalfa (lucerne), clover, sainfoin, forage kale, lupines, vetches and similar forage products, whether or not in the form of pellets.
- 1214.10.00 Alfalfa (lucerne) meal and pellets: General 1.4%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 20%.
- 1214.10.00.10 Cubes (under: Dehydrated) (t).
- 1214.10.00.15 Other (under: Dehydrated) (t).
- 1214.10.00.30 Cubes (under: Sun-cured) (t).
- 1214.10.00.50 Other (under: Sun-cured) (t).
- 1214.10.00.60 Other (under: Other) (t).
- 1214.90.00 Other (under: Rutabagas (swedes), mangolds, fodder roots, hay, alfalfa (lucerne), clover, sainfoin, forage kale, lupines, vetches and similar forage products, whether or not in the form of pellets): General Free; Special none; Column 2 $5.51/t.
- 1214.90.00.10 Alfalfa, whether or not double compressed (t).
- 1214.90.00.18 Timothy (under: Hay) (t).
- 1214.90.00.25 Other (under: Hay) (t).
- 1214.90.00.30 Clover (under: Other) (t).
- 1214.90.00.90 Other (under: Other) (t).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.