HTS Heading 1301
Lac; natural gums, resins, gum-resins and oleoresins (for example, balsams)
All 8 HTS codes under heading 1301 (lac), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.3%.
Every line of heading 1301
- 1301 Lac; natural gums, resins, gum-resins and oleoresins (for example, balsams).
- 1301.20.00.00 Gum Arabic (under: Lac; natural gums, resins, gum-resins and oleoresins (for example, balsams)) (kg): General Free; Special none; Column 2 1.1¢/kg.
- 1301.90 Other (under: Lac; natural gums, resins, gum-resins and oleoresins (for example, balsams)).
- 1301.90.40.00 Turpentine gum (oleoresinous exudate from living trees) (kg): General 1.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5%.
- 1301.90.91 Other (under: Other): General Free; Special none; Column 2 Free.
- 1301.90.91.05 Balsams (under: Other) (kg).
- 1301.90.91.10 Bleached shellac (under: Other) (kg).
- 1301.90.91.20 Seed lac (under: Other) (kg).
- 1301.90.91.30 Tragacanth (under: Other) (kg).
- 1301.90.91.40 Karaya (under: Other) (kg).
- 1301.90.91.90 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.