HTS Heading 1404

Vegetable products not elsewhere specified or included

All 8 HTS codes under heading 1404 (vegetable products not), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.3%, some per unit.

Every line of heading 1404

  • 1404 Vegetable products not elsewhere specified or included.
  • 1404.20.00.00 Cotton linters (under: Vegetable products not elsewhere specified or included) (kg): General Free; Special none; Column 2 Free.
  • 1404.90 Other (under: Vegetable products not elsewhere specified or included).
  • 1404.90.10.00 Vegetable hair (under: Other) (kg): General 0.5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 2.2¢/kg.
  • 1404.90.20.00 Broomcorn (Sorghum vulgare var. technicum) (t): General $4.95/t; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 $22/t.
  • 1404.90.30.00 Istle (under: Vegetable materials of a kind used primarily in brooms or in brushes (for example, broomcorn piassava, couch grass and istle), whether or not in hanks or bundles) (kg): General Free; Special none; Column 2 Free.
  • 1404.90.40.00 Other (under: Vegetable materials of a kind used primarily in brooms or in brushes (for example, broomcorn piassava, couch grass and istle), whether or not in hanks or bundles) (kg): General 2.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 1404.90.90 Other (under: Other): General Free; Special none; Column 2 Free.
  • 1404.90.90.20 Canaigre, chestnut, curupay, divi-divi, eucalyptus, gall nuts, hemlock, larch, mangrove, myrobalan, oak, quebracho, sumac, tara, urunday, valonia, wattle and other materials of a kind used primarily in tanning (kg).
  • 1404.90.90.40 Other (under: Raw vegetable materials of a kind used primarily in dyeing or tanning) (kg).
  • 1404.90.90.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.