HTS Heading 1512
Sunflower-seed, safflower or cottonseed oil, and fractions thereof, whether or not refined, but not chemically modified
All 9 HTS codes under heading 1512 (sunflower-seed), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.4%, some per unit.
Every line of heading 1512
- 1512 Sunflower-seed, safflower or cottonseed oil, and fractions thereof, whether or not refined, but not chemically modified.
- 1512.11.00 Crude oil (under: Sunflower-seed or safflower oil and fractions thereof): General 1.7¢/kg + 3.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9.9¢/kg + 20%.
- 1512.11.00.25 Certified organic (under: Sunflower-seed oil) (kg).
- 1512.11.00.35 Other (under: Sunflower-seed oil) (kg).
- 1512.11.00.40 Safflower oil (under: Crude oil) (kg).
- 1512.19.00 Other (under: Sunflower-seed or safflower oil and fractions thereof): General 1.7¢/kg + 3.4%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 9.9¢/kg + 20%.
- 1512.19.00.25 Certified organic (under: Sunflower-seed oil) (kg).
- 1512.19.00.35 Other (under: Sunflower-seed oil) (kg).
- 1512.19.00.40 Safflower oil (under: Other) (kg).
- 1512.21.00.00 Crude oil, whether or not gossypol has been removed (kg): General 5.6¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
- 1512.29.00 Other (under: Cottonseed oil and its fractions): General 5.6¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
- 1512.29.00.20 Once-refined (subjected to alkalai or caustic wash, but not bleached or deodorized) (kg).
- 1512.29.00.40 Other (fully refined, washed, bleached or deodorized) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.