HTS Heading 1513
Coconut (copra), palm kernel or babassu oil, and fractions thereof, whether or not refined, but not chemically modified
All 5 HTS codes under heading 1513 (coconut (copra), palm kernel or babassu oil), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 1513
- 1513 Coconut (copra), palm kernel or babassu oil, and fractions thereof, whether or not refined, but not chemically modified.
- 1513.11.00.00 Crude oil (under: Coconut (copra) oil and its fractions) (kg): General Free; Special none; Column 2 4.4¢/kg.
- 1513.19.00 Other (under: Coconut (copra) oil and its fractions): General Free; Special none; Column 2 4.4¢/kg.
- 1513.19.00.30 Certified organic (under: Other) (kg).
- 1513.19.00.90 Other (under: Other) (kg).
- 1513.21.00.00 Crude oil (under: Palm kernel or babassu oil and fractions thereof) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 1513.29.00.00 Other (under: Palm kernel or babassu oil and fractions thereof) (kg): General Free; Special none; Column 2 2.2¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.