HTS Heading 1514

Rapeseed, colza or mustard oil, and fractions thereof, whether or not refined, but not chemically modified

All 10 HTS codes under heading 1514 (rapeseed), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.4%, some per unit.

Every line of heading 1514

  • 1514 Rapeseed, colza or mustard oil, and fractions thereof, whether or not refined, but not chemically modified.
  • 1514.11.00.00 Crude oil (under: Low erucic acid rape or colza oil and its fractions) (kg): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.5%.
  • 1514.19.00.00 Other (under: Low erucic acid rape or colza oil and its fractions) (kg): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.5%.
  • 1514.91 Crude oil (under: Other).
  • 1514.91.10.00 Imported to be used in the manufacture of rubber substitutes or lubricating oil (kg): General Free; Special none; Column 2 1.8¢/kg.
  • 1514.91.90 Other (under: Crude oil): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 22.5%.
  • 1514.91.90.10 Rape or colza oil and its fractions (kg).
  • 1514.91.90.20 Mustard seed oil and its fractions (kg).
  • 1514.99 Other (under: Other).
  • 1514.99.10.00 Imported to be used in the manufacture of rubber substitutes or lubricating oil (kg): General Free; Special none; Column 2 1.8¢/kg.
  • 1514.99.50 Denatured (under: Other): General 1.3¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 9.92¢/kg.
  • 1514.99.50.10 Rape or colza oil and its fractions (kg).
  • 1514.99.50.20 Mustard seed oil and its fractions (kg).
  • 1514.99.90 Other (under: Other): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.5%.
  • 1514.99.90.10 Rape or colza oil and its fractions (kg).
  • 1514.99.90.20 Mustard seed oil and its fractions (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.