HTS Heading 1515
Other fixed vegetable or microbial fats and oils (including jojoba oil) and their fractions, whether or not refined, but not chemically modified
All 15 HTS codes under heading 1515 (other fixed vegetable), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.4%, some per unit.
Every line of heading 1515
- 1515 Other fixed vegetable or microbial fats and oils (including jojoba oil) and their fractions, whether or not refined, but not chemically modified.
- 1515.11.00.00 Crude oil (under: Linseed oil and its fractions) (kg): General 6.3¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9.9¢/kg.
- 1515.19.00.00 Other (under: Linseed oil and its fractions) (kg): General 6.3¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9.9¢/kg.
- 1515.21.00.00 Crude oil (under: Corn (maize) oil and its fractions) (kg): General 3.4%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 20%.
- 1515.29.00 Other (under: Corn (maize) oil and its fractions): General 3.4%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 20%.
- 1515.29.00.20 Once-refined (subjected to alkalai or caustic wash, but not bleached or deodorized) (kg).
- 1515.29.00.40 Other (fully refined, washed, bleached or deodorized) (kg).
- 1515.30.00.00 Castor oil and its fractions (under: Other fixed vegetable or microbial fats and oils (including jojoba oil) and their fractions, whether or not refined, but not chemically modified) (kg): General Free; Special none; Column 2 6.6¢/kg.
- 1515.50.00.00 Sesame oil and its fractions (under: Other fixed vegetable or microbial fats and oils (including jojoba oil) and their fractions, whether or not refined, but not chemically modified) (kg): General 0.68¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
- 1515.60.05.00 Microbial fats and oils and their fractions (kg): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1515.90 Other (under: Other fixed vegetable or microbial fats and oils (including jojoba oil) and their fractions, whether or not refined, but not chemically modified).
- 1515.90.21.00 Nut oils (under: Other) (kg): General Free; Special none; Column 2 Free.
- 1515.90.60.00 Jojoba oil and its fractions (under: Other) (kg): General 2.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1515.90.81 Other (under: Other): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1515.90.81.10 Hemp oil (under: Other) (kg).
- 1515.90.81.20 Certified organic (under: Avocado oil) (kg).
- 1515.90.81.40 Other (under: Avocado oil) (kg).
- 1515.90.81.75 Certified organic (under: Other) (kg).
- 1515.90.81.85 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.