HTS Heading 1516

Animal, vegetable or microbial fats and oils and their fractions, partly or wholly hydrogenated, inter-esterified, re-esterified or elaidinized, whether or not refined, but not further prepared

All 4 HTS codes under heading 1516 (animal), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7.7%, some per unit.

Every line of heading 1516

  • 1516 Animal, vegetable or microbial fats and oils and their fractions, partly or wholly hydrogenated, inter-esterified, re-esterified or elaidinized, whether or not refined, but not further prepared.
  • 1516.10.00.00 Animal fats and oils and their fractions (kg): General 7¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
  • 1516.20 Vegetable fats and oils and their fractions.
  • 1516.20.10.00 Rapeseed oil (under: Vegetable fats and oils and their fractions) (kg): General 7.7%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12.5%.
  • 1516.20.91.00 Other (under: Vegetable fats and oils and their fractions) (kg): General 8.8¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg.
  • 1516.30.00.00 Microbial fats and oils and their fractions (kg): General 8.8¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.