HTS Heading 2003

Mushrooms and truffles, prepared or preserved otherwise than by vinegar or acetic acid

All 9 HTS codes under heading 2003 (mushrooms and truffles), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2003

  • 2003 Mushrooms and truffles, prepared or preserved otherwise than by vinegar or acetic acid.
  • 2003.10.01 Mushrooms of the genus Agaricus: General 6¢/kg on drained weight + 8.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22¢/kg on drained weight + 45%.
  • 2003.10.01.27 Whole (including buttons) (under: In containers each holding not more than 255 g) (kg).
  • 2003.10.01.31 Sliced (under: In containers each holding not more than 255 g) (kg).
  • 2003.10.01.37 Other (under: In containers each holding not more than 255 g) (kg).
  • 2003.10.01.43 Whole (including buttons) (under: In containers each holding more than 255 g) (kg).
  • 2003.10.01.47 Sliced (under: In containers each holding more than 255 g) (kg).
  • 2003.10.01.53 Other (under: In containers each holding more than 255 g) (kg).
  • 2003.90 Other (under: Mushrooms and truffles, prepared or preserved otherwise than by vinegar or acetic acid).
  • 2003.90.10.00 Truffles (under: Other) (kg): General Free; Special none; Column 2 Free.
  • 2003.90.80 Other (under: Other): General 6¢/kg on drained weight + 8.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22¢/kg on drained weight + 45%.
  • 2003.90.80.10 Straw mushrooms (under: Other) (kg).
  • 2003.90.80.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.