HTS Heading 2004

Other vegetables prepared or preserved otherwise than by vinegar or acetic acid, frozen, other than products of heading 2006

All 12 HTS codes under heading 2004 (other vegetables prepared), with their duty rates from the 2026 HTS Revision 23. General duty 3.2% to 11.2%.

Every line of heading 2004

  • 2004 Other vegetables prepared or preserved otherwise than by vinegar or acetic acid, frozen, other than products of heading 2006.
  • 2004.10 Potatoes (under: Other vegetables prepared or preserved otherwise than by vinegar or acetic acid, frozen, other than products of heading 2006).
  • 2004.10.40.00 Yellow (Solano) potatoes (under: Potatoes) (kg): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2004.10.80 Other (under: Potatoes): General 8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2004.10.80.20 French fries (under: Other) (kg).
  • 2004.10.80.40 Other (under: Other) (kg).
  • 2004.90 Other vegetables and mixtures of vegetables.
  • 2004.90.10.00 Antipasto (under: Other vegetables and mixtures of vegetables) (kg): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 2004.90.80.00 Beans (under: Other vegetables and mixtures of vegetables) (kg): General 2.1¢/kg on entire contents of container; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg on entire contents of container.
  • 2004.90.85 Other (under: Other vegetables and mixtures of vegetables): General 11.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 2004.90.85.20 Carrots (under: Other) (kg).
  • 2004.90.85.40 Sweet corn (under: Other) (kg).
  • 2004.90.85.60 Peas (under: Other) (kg).
  • 2004.90.85.65 Peeled clove garlic, whether or not individually quick frozen (kg).
  • 2004.90.85.75 Garlic, reduced in size beyond the clove, whether or not individually quick frozen (kg).
  • 2004.90.85.85 Other (under: Garlic) (kg).
  • 2004.90.85.95 Other, including mixtures (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.