HTS Heading 2102

Yeasts (active or inactive); other single-cell microorganisms, dead (but not including vaccines of heading 3002); prepared baking powders

All 5 HTS codes under heading 2102 (yeasts (active or inactive)), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.4%.

Every line of heading 2102

  • 2102 Yeasts (active or inactive); other single-cell microorganisms, dead (but not including vaccines of heading 3002); prepared baking powders.
  • 2102.10.00.00 Active yeasts (under: Yeasts (active or inactive); other single-cell microorganisms, dead (but not including vaccines of heading 3002); prepared baking powders) (kg): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2102.20 Inactive yeasts; other single-cell microorganisms, dead.
  • 2102.20.20.00 Yeasts (except dried brewers' yeast) (kg): General 6.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2102.20.40.00 Dried brewers' yeast, crude (under: Inactive yeasts; other single-cell microorganisms, dead) (kg): General Free; Special none; Column 2 Free.
  • 2102.20.60.00 Other (under: Inactive yeasts; other single-cell microorganisms, dead) (kg): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2102.30.00.00 Prepared baking powders (under: Yeasts (active or inactive); other single-cell microorganisms, dead (but not including vaccines of heading 3002); prepared baking powders) (kg): General Free; Special none; Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.