HTS Heading 2104
Soups and broths and preparations therefor; homogenized composite food preparations
All 6 HTS codes under heading 2104 (soups and broths and preparations therefor), with their duty rates from the 2026 HTS Revision 23. General duty 2.5% to 6.4%.
Every line of heading 2104
- 2104 Soups and broths and preparations therefor; homogenized composite food preparations.
- 2104.10.00 Soups and broths and preparations therefor: General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2104.10.00.20 Dried (under: Soups and broths and preparations therefor) (kg).
- 2104.10.00.40 Based on fish or other seafood (kg).
- 2104.10.00.55 Certified organic (under: Other) (kg).
- 2104.10.00.65 Other (under: Other) (kg).
- 2104.20 Homogenized composite food preparations.
- 2104.20.10.00 Put up for retail sale as food suitable for infants or for dietetic purposes (kg): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 2104.20.50.00 Put up for retail sale as food suitable for young children (kg): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.