HTS Heading 2106

Food preparations not elsewhere specified or included

All 58 HTS codes under heading 2106 (food preparations not), with their duty rates from the 2026 HTS Revision 23. General duty Free to 10%, some per unit.

Every line of heading 2106

  • 2106 Food preparations not elsewhere specified or included.
  • 2106.10.00.00 Protein concentrates and textured protein substances (kg): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2106.90 Other (under: Food preparations not elsewhere specified or included).
  • 2106.90.03.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General 2.9¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12.1¢/kg.
  • 2106.90.06.00 Described in additional U.S. note 10 to chapter 4 and entered pursuant to its provisions (kg, kg cmsc): General 2.9¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12.1¢/kg.
  • 2106.90.09.00 Other (under: Products derived from the dried milk, dried buttermilk or dried whey of subheadings 0402.10, 0402.21.05, 0402.21.25, 0402.21.30, 0402.21.50, 0403.90.41, 0403.90.45, 0404.10.50 or 0404.10.90, which contain not over 5.5 percent by weight of butterfat and which are mixed with other ingredients including, but not limited to sugar, if such mixtures contain over 16 percent milk solids by weight, are capable of being further processed or mixed with similar ingredients and are not prepared for marketing to the retail consumer in the identical form and package in which imported) (kg, kg cmsc): General 86.2¢/kg; Special Free (BH,CL,JO,KR,MA,OM,P,PA,PE,SG) See 9822.04.25 (AU) See 9823.08.01-9823.08.38 (S+) See 9918.04.60-9918.04.80 (CO); Column 2 $1.014/kg.
  • 2106.90.12.00 Containing not over 20 percent of alcohol by weight (kg): General 4.2¢/kg + 1.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 44¢/kg + 25%.
  • 2106.90.15.00 Containing over 20 percent but not over 50 percent of alcohol by weight (kg): General 8.4¢/kg + 1.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 88¢/kg + 25%.
  • 2106.90.18.00 Containing over 50 percent of alcohol by weight (kg): General 17¢/kg + 1.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.76/kg + 25%.
  • 2106.90.22.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General 15.4¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 31¢/kg.
  • 2106.90.24.00 Described in additional U.S. note 14 to chapter 4 and entered pursuant to its provisions (kg, kg cmsc): General 15.4¢/kg; Special Free (A+,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 31¢/kg.
  • 2106.90.26.00 Other (under: Butter substitutes containing over 45 percent by weight of butterfat) (kg, kg cmsc): General $1.996/kg; Special Free (BH,CL,CO,JO,KR,MA,OM,P,PA,PE,SG) See 9822.04.10 (AU) See 9823.03.01-9823.03.12 (S+); Column 2 $2.348/kg.
  • 2106.90.28.00 Other (under: Containing over 10 percent by weight of milk solids) (kg, kg cmsc): General 13.1¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 31¢/kg.
  • 2106.90.32.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General 15.4¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 31¢/kg.
  • 2106.90.34.00 Described in additional U.S. note 14 to chapter 4 and entered pursuant to its provisions (kg, kg cmsc): General 15.4¢/kg; Special Free (A+,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 31¢/kg.
  • 2106.90.36.00 Other (under: Butter substitutes containing over 45 percent by weight of butterfat) (kg, kg cmsc): General $1.996/kg; Special Free (BH,CL,CO,JO,KR,MA,OM,P,PA,PE,SG) See 9822.04.10 (AU) See 9823.03.01-9823.03.12 (S+); Column 2 $2.348/kg.
  • 2106.90.38.00 Other (under: Other) (kg, kg cmsc): General 13.1¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 31¢/kg.
  • 2106.90.39.00 Artificially sweetened cough drops (kg): General Free; Special none; Column 2 30%.
  • 2106.90.42.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General 3.6606¢/kg of total sugars; Special Free (A*,AU,BH,CL,CO,D,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.58170¢/kg of total sugars.
  • 2106.90.44.00 Described in additional U.S. note 5 to chapter 17 andentered pursuant to its provisions (kg): General 3.6606¢/kg of total sugars; Special Free (A*,BH,CL,CO,D,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG) See 9822.05.15 (P+); Column 2 6.58170¢/kg of total sugars.
  • 2106.90.46.00 Other (under: Syrups derived from cane or beet sugar, containing added coloring but not added flavoring matter) (kg): General 35.74¢/kg; Special Free (BH,CL,JO,KR,OM,SG) See 9822.05.20 (P+) See 9822.06.10 (PE) See 9822.08.01 (CO) See 9822.09.17 (PA) See 9823.10.01-9823.10.45 (S+) See 9822.03.01(MA); Column 2 42.05¢/kg.
  • 2106.90.48.00 Orange juice (under: Fruit or vegetable juices, fortified with vitamins or minerals) (liters): General 7.85¢/liter; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
  • 2106.90.52.00 Juice of any single fruit or vegetable (liters): General The rate applicable to the natural juice in heading 2009; Special Free (AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG)The rate applicable to the natural juice in heading 2009 (A*,D); Column 2 The rate applicable to the natural juice in heading 2009.
  • 2106.90.54.00 Mixtures of juices (under: Other) (liters): General The rate applicable to the natural juice in heading 2009; Special Free (AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG)The rate applicable to the natural juice in heading 2009 (A*,D); Column 2 The rate applicable to the natural juice in heading 2009.
  • 2106.90.58 Of gelatin (under: Other): General 4.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2106.90.58.30 Containing sugar derived from sugar cane or sugar beets (kg).
  • 2106.90.58.50 Other (under: Put up for retail sale) (kg).
  • 2106.90.58.70 Containing sugar derived from sugar cane or sugar beets (kg).
  • 2106.90.58.90 Other (under: Other) (kg).
  • 2106.90.62.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General 10%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2106.90.64.00 Described in additional U.S. note 10 to chapter 4 and entered pursuant to its provisions (kg, kg cmsc): General 10%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2106.90.66.00 Other (under: Other, dairy products described in additional U.S. note 1 to chapter 4) (kg, kg cmsc): General 70.4¢/kg + 8.5%; Special Free (BH,CL,JO,KR,MA,OM,P,PA,PE,SG) See 9822.04.25 (AU) See 9823.08.01-9823.08.38 (S+) See 9918.04.60, 9918.04.67 (CO); Column 2 82.8¢/kg + 10%.
  • 2106.90.68.00 Described in additional U.S. note 9 to chapter 17 and entered pursuant to its provisions (kg, kg cmsc): General 10%; Special Free (CO,KR,OM,PA,PE,S); Column 2 20%.
  • 2106.90.72.00 Other (under: Blended syrups described in additional U.S. note 4 to chapter 17) (kg, kg cmsc): General 70.4¢/kg + 8.5%; Special Free (BH,CL,JO,KR,OM,SG) See 9822.05.20 (P+) See 9822.06.10 (PE) See 9822.08.01 (CO) See 9822.09.17 (PA) See 9823.10.01-9823.10.45 (S+) See 9822.03.01(MA); Column 2 82.8¢/kg + 10%.
  • 2106.90.74.00 Described in additional U.S. note 7 to chapter 17 and entered pursuant to its provisions (kg, kg cmsc): General 10%; Special Free (CO,KR,OM,PA,PE,S); Column 2 20%.
  • 2106.90.76.00 Other (under: Articles containing over 65 percent by dry weight of sugar described in additional U.S. note 2 to chapter 17) (kg, kg cmsc): General 70.4¢/kg + 8.5%; Special Free (BH,CL,JO,KR,OM,SG) See 9822.05.20 (P+) See 9822.06.10 (PE) See 9822.08.01 (CO) See 9822.09.17 (PA) See 9823.10.01-9823.10.45 (S+) See 9822.03.01(MA); Column 2 82.8¢/kg + 10%.
  • 2106.90.78.00 Described in additional U.S. note 8 to chapter 17 and entered pursuant to its provisions (kg, kg cmsc): General 10%; Special Free (A+,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2106.90.80.00 Other (under: Articles containing over 10 percent by dry weight of sugar described in additional U.S. note 3 to chapter 17) (kg, kg cmsc): General 70.4¢/kg + 8.5%; Special Free (BH,CL,JO,KR,OM,SG) See 9822.05.20 (P+) See 9822.06.10 (PE) See 9822.08.01 (CO) See 9822.09.17 (PA) See 9823.10.01-9823.10.45 (S+) See 9822.03.01(MA); Column 2 82.8¢/kg + 10%.
  • 2106.90.82.00 Other (under: Other) (kg, kg cmsc): General 6.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2106.90.83.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General 10%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2106.90.85.00 Described in additional U.S. note 10 to chapter 4 and entered pursuant to its provisions (kg): General 10%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2106.90.87.00 Other (under: Other, dairy products described in additional U.S. note 1 to chapter 4) (kg): General 28.8¢/kg + 8.5%; Special Free (BH,CL,JO,KR,MA,OM,P,PA,PE,SG) See 9822.04.25 (AU) See 9823.08.01-9823.08.38 (S+) See 9918.04.60, 9918.04.79 (CO); Column 2 33.9¢/kg +10%.
  • 2106.90.89.00 Described in additional U.S. note 9 to chapter 17 and entered pursuant to its provisions (kg): General 10%; Special Free (CO,KR,OM,PA,PE,S); Column 2 20%.
  • 2106.90.91.00 Other (under: Blended syrups described in additional U.S. note 4 to chapter 17) (kg): General 28.8¢/kg + 8.5%; Special Free (BH,CL,JO,KR,OM,SG) See 9822.05.20 (P+) See 9822.06.10 (PE) See 9822.08.01 (CO) See 9822.09.17 (PA) See 9823.10.01-9823.10.45 (S+) See 9822.03.01(MA); Column 2 33.9¢/kg + 10%.
  • 2106.90.92.00 Described in additional U.S. note 7 to chapter 17 and entered pursuant to its provisions (kg): General 10%; Special Free (CO,KR,OM,PA,PE,S); Column 2 20%.
  • 2106.90.94.00 Other (under: Articles containing over 65 percent by dry weight of sugar described in additional U.S. note 2 to chapter 17) (kg): General 28.8¢/kg + 8.5%; Special Free (BH,CL,JO,KR,OM,SG) See 9822.05.20 (P+) See 9822.06.10 (PE) See 9822.08.01 (CO) See 9822.09.17 (PA) See 9823.10.01-9823.10.45 (S+) See 9822.03.01(MA); Column 2 33.9¢/kg + 10%.
  • 2106.90.95.00 Described in additional U.S. note 8 to chapter 17 and entered pursuant to its provisions (kg): General 10%; Special Free (A+,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2106.90.97.00 Other (under: Articles containing over 10 percent by dry weight of sugar described in additional U.S. note 3 to chapter 17) (kg): General 28.8¢/kg + 8.5%; Special Free (BH,CL,JO,KR,OM,SG) See 9822.05.20 (P+) See 9822.06.10 (PE) See 9822.08.01 (CO) See 9822.09.17 (PA) See 9823.10.01-9823.10.45 (S+) See 9822.03.01(MA); Column 2 33.9¢/kg + 10%.
  • 2106.90.99 Other (under: Other): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 2106.90.99.71 Containing high-intensity sweeteners (e.g., aspartame and/or saccharin (kg).
  • 2106.90.99.72 Containing sugar derived from sugar cane and/or sugar beets (kg).
  • 2106.90.99.73 Other (under: Preparations for the manufacture of beverages) (kg).
  • 2106.90.99.75 Non-dairy coffee whiteners (under: Other) (kg).
  • 2106.90.99.80 Other cream or milk substitutes (kg).
  • 2106.90.99.85 Confectionery (including gum) containing synthetic sweetening agents (e.g., saccharin) instead of sugar (kg).
  • 2106.90.99.87 Herbal teas and herbal infusions comprising mixed herbs (kg).
  • 2106.90.99.88 Flavored honey (under: Other) (kg).
  • 2106.90.99.90 Canned (under: Other) (kg).
  • 2106.90.99.91 Frozen (under: Other) (kg).
  • 2106.90.99.92 Containing sugar derived from sugar cane and/or sugar beets (kg).
  • 2106.90.99.93 Certified organic (under: Other) (kg).
  • 2106.90.99.94 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.