HTS Heading 2201
Waters, including natural or artificial mineral waters and aerated waters, not containing added sugar or other sweetening matter nor flavored; ice and snow
All 2 HTS codes under heading 2201 (waters), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 2201
- 2201 Waters, including natural or artificial mineral waters and aerated waters, not containing added sugar or other sweetening matter nor flavored; ice and snow.
- 2201.10.00.00 Mineral waters and aerated waters (liters): General 0.26¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 2.6¢/liter.
- 2201.90.00.00 Other (under: Waters, including natural or artificial mineral waters and aerated waters, not containing added sugar or other sweetening matter nor flavored; ice and snow) (t): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.