HTS Heading 2203
Beer made from malt
All 3 HTS codes under heading 2203 (beer made from malt), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2203
- 2203.00.00 Beer made from malt: General Free; Special none; Column 2 13.2¢/liter.
- 2203.00.00.30 In glass containers (under: In containers each holding not over 4 liters) (liters).
- 2203.00.00.60 Other (under: In containers each holding not over 4 liters) (liters).
- 2203.00.00.90 In containers each holding over 4 liters (liters).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.