HTS Heading 2202
Waters, including mineral waters and aerated waters, containing added sugar or other sweetening matter or flavored, and other non-alcoholic beverages, not including fruit, nut or vegetable juices of heading 2009
All 19 HTS codes under heading 2202 (waters), with their duty rates from the 2026 HTS Revision 23. General duty Free to 17.5%, some per unit.
Every line of heading 2202
- 2202 Waters, including mineral waters and aerated waters, containing added sugar or other sweetening matter or flavored, and other non-alcoholic beverages, not including fruit, nut or vegetable juices of heading 2009.
- 2202.10.00 Waters, including mineral waters and aerated waters, containing added sugar or other sweetening matter or flavored: General 0.2¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4¢/liter.
- 2202.10.00.20 Containing high-intensity sweeteners (e.g., aspartame and/or saccharin) (liters).
- 2202.10.00.45 In aluminum containers (under: Other) (liters).
- 2202.10.00.55 Other (under: Other) (liters).
- 2202.10.00.65 In aluminum containers (under: Other) (liters).
- 2202.10.00.75 Other (under: Other) (liters).
- 2202.91.00 Non-alcoholic beer (under: Other): General 0.2¢/liter; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4¢/liter.
- 2202.91.00.10 In aluminum containers (under: Non-alcoholic beer) (liters).
- 2202.91.00.20 Other (under: Non-alcoholic beer) (liters).
- 2202.99 Other (under: Other).
- 2202.99.10.00 Chocolate milk drink (under: Milk-based drinks) (liters, kg cmsc): General 17%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 2202.99.22.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (liters, kg): General 17.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2202.99.24.00 Described in additional U.S. note 10 to chapter 4 and entered pursuant to its provisions (liters, kg): General 17.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 2202.99.28.00 Other (under: Other) (liters, kg): General 23.5¢/liter + 14.9%; Special Free (BH,CL,JO,KR,MA,OM,P,PA,PE,SG) See 9822.04.25 (AU) See 9823.01.01-9823.01.07 (S+) See 9918.04.60, 9918.04.80 (CO); Column 2 27.6¢/liter+ 17.5%.
- 2202.99.30.00 Not made from a juice having a degree of concentration of 1.5 or more (as determined before correction to the nearest 0.5 degree) (liters): General 4.5¢/liter; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2202.99.35.00 Other (under: Orange juice) (liters): General 7.85¢/liter; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18¢/liter.
- 2202.99.36.00 Juice of any single fruit or vegetable (liters): General The rate applicable to the natural juice in heading 2009; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG)The rate applicable to the natural juice in heading 2009(A*); Column 2 The rate applicable to the natural juice in heading 2009.
- 2202.99.37.00 Mixtures of juices (under: Other) (liters): General The rate applicable to the natural juice in heading 2009; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) The rate applicable to the natural juice in heading 2009 (A*); Column 2 The rate applicable to the natural juice in heading 2009.
- 2202.99.91 Other (under: Other): General 0.2¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4¢/liter.
- 2202.99.91.10 In aluminum containers (under: Other) (liters).
- 2202.99.91.30 Certified organic (under: Almond-based drinks) (liters).
- 2202.99.91.35 Other (under: Almond-based drinks) (liters).
- 2202.99.91.90 Other (under: Other) (liters).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.