HTS Heading 2205

Vermouth and other wine of fresh grapes flavored with plants or aromatic substances

All 5 HTS codes under heading 2205 (vermouth and other wine), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 2205

  • 2205 Vermouth and other wine of fresh grapes flavored with plants or aromatic substances.
  • 2205.10 In containers holding 2 liters or less.
  • 2205.10.30.00 Vermouth (under: In containers holding 2 liters or less) (liters): General 3.5¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG)1.5¢/liter(JO); Column 2 33¢/ liter.
  • 2205.10.60.00 Other (under: In containers holding 2 liters or less) (liters): General 4.2¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG)1.8¢/liter(JO); Column 2 33¢/ liter.
  • 2205.90 Other (under: Vermouth and other wine of fresh grapes flavored with plants or aromatic substances).
  • 2205.90.20.00 In containers each holding over 2 liters but not over 4 liters (liters): General 3.5¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG)1.5¢/liter(JO); Column 2 33¢/liter.
  • 2205.90.40.00 In containers each holding over 4 liters (liters): General 3.8¢/liter; Special Free (A+,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG) 1.6¢/liter (JO); Column 2 33¢/liter.
  • 2205.90.60.00 Other (under: Other) (liters): General 4.2¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG)1.8¢/liter(JO); Column 2 33¢/liter.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.