HTS Heading 2206

Other fermented beverages (for example, cider, perry, mead, sakè); mixtures of fermented beverages and mixtures of fermented beverages and non-alcoholic beverages, not elsewhere specified or included

All 9 HTS codes under heading 2206 (other fermented beverages), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 2206

  • 2206.00 Other fermented beverages (for example, cider, perry, mead, sakè); mixtures of fermented beverages and mixtures of fermented beverages and non-alcoholic beverages, not elsewhere specified or included.
  • 2206.00.15 Cider, whether still or sparkling: General 0.4¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG)0.1¢/liter(JO); Column 2 1.3¢/liter.
  • 2206.00.15.10 Hard cider as described in statistical note 3 to this chapter (liters).
  • 2206.00.15.20 Other (under: Cider, whether still or sparkling) (liters).
  • 2206.00.30.00 Prune wine (under: Other fermented beverages (for example, cider, perry, mead, sakè); mixtures of fermented beverages and mixtures of fermented beverages and non-alcoholic beverages, not elsewhere specified or included) (liters, pf.liters): General 3.1¢/liter + 22.1¢/pf. liter on ethyl alcohol content; Special Free (A+,AU,BH,CL,CO,D,E, IL,KR,MA, OM,P,PA,PE,S, SG) 1.3¢/liter + 9.8¢/pf. liter on ethyl alcohol content (JO); Column 2 18.5¢/ liter + $1.32/pf. liter on ethyl alcohol content.
  • 2206.00.45.00 Rice wine or sakè (under: Other fermented beverages (for example, cider, perry, mead, sakè); mixtures of fermented beverages and mixtures of fermented beverages and non-alcoholic beverages, not elsewhere specified or included) (liters): General 3¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG)1.3¢/liter(JO); Column 2 33¢/liter.
  • 2206.00.60.00 Effervescent wine (under: Other) (liters): General 13.9¢/liter; Special Free (A+,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG) 6.1¢/liter (JO); Column 2 $1.59/liter.
  • 2206.00.90 Other (under: Other): General 4.2¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG)1.8¢/liter(JO); Column 2 33¢/liter.
  • 2206.00.90.15 In aluminum containers (under: Mixtures of fermented beverages and non-alcoholic beverages, ready to consume as packaged, in containers each holding not over 4 liters) (liters).
  • 2206.00.90.25 Other (under: Mixtures of fermented beverages and non-alcoholic beverages, ready to consume as packaged, in containers each holding not over 4 liters) (liters).
  • 2206.00.90.30 In aluminum containers (under: Other) (liters).
  • 2206.00.90.40 Other (under: Other) (liters).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.