HTS Heading 2207

Undenatured ethyl alcohol of an alcoholic strength by volume of 80 percent vol. or higher; ethyl alcohol and other spirits, denatured, of any strength

All 5 HTS codes under heading 2207 (undenatured ethyl alcohol), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.5%, some per unit.

Every line of heading 2207

  • 2207 Undenatured ethyl alcohol of an alcoholic strength by volume of 80 percent vol. or higher; ethyl alcohol and other spirits, denatured, of any strength.
  • 2207.10 Undenatured ethyl alcohol of an alcoholic strength by volume of 80 percent vol. or higher.
  • 2207.10.30.00 For beverage purposes (under: Undenatured ethyl alcohol of an alcoholic strength by volume of 80 percent vol. or higher) (pf.liters): General 18.9¢/pf.liter; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.32/pf. liter.
  • 2207.10.60 For nonbeverage purposes (under: Undenatured ethyl alcohol of an alcoholic strength by volume of 80 percent vol. or higher): General 2.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PE,S,SG) See 9822.09.22-9822.09.24 (PA); Column 2 20%.
  • 2207.10.60.10 For fuel use (under: For nonbeverage purposes) (liters).
  • 2207.10.60.90 Other (under: For nonbeverage purposes) (liters).
  • 2207.20.00 Ethyl alcohol and other spirits, denatured, of any strength: General 1.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PE,S,SG) See 9822.09.22-9822.09.24 (PA); Column 2 20%.
  • 2207.20.00.10 For fuel use (under: Ethyl alcohol and other spirits, denatured, of any strength) (liters).
  • 2207.20.00.90 Other (under: Ethyl alcohol and other spirits, denatured, of any strength) (liters).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.