HTS Heading 2209
Vinegar and substitutes for vinegar obtained from acetic acid
All 2 HTS codes under heading 2209 (vinegar and substitutes), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 2209
- 2209.00.00 Vinegar and substitutes for vinegar obtained from acetic acid: General 0.5¢/pf.liter; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 2.1¢/pf.liter.
- 2209.00.00.30 Certified organic (under: Vinegar and substitutes for vinegar obtained from acetic acid) (pf.liters, liters).
- 2209.00.00.60 Other (under: Vinegar and substitutes for vinegar obtained from acetic acid) (pf.liters, liters).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.