HTS Heading 2301

Flours, meals and pellets, of meat or meat offal, of fish or of crustaceans, molluscs or other aquatic invertebrates, unfit for human consumption; greaves (cracklings)

All 3 HTS codes under heading 2301 (flours, meals and pellets, of meat or meat offal), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2301

  • 2301 Flours, meals and pellets, of meat or meat offal, of fish or of crustaceans, molluscs or other aquatic invertebrates, unfit for human consumption; greaves (cracklings).
  • 2301.10.00.00 Flours, meals and pellets, of meat or meat offal; greaves (cracklings) (t): General Free; Special none; Column 2 Free.
  • 2301.20.00 Flours, meals and pellets, of fish or of crustaceans, molluscs or other aquatic invertebrates: General Free; Special none; Column 2 Free.
  • 2301.20.00.10 Herring meal; pilchard meal (under: Flours, meals and pellets, of fish or of crustaceans, molluscs or other aquatic invertebrates) (t).
  • 2301.20.00.90 Other (under: Flours, meals and pellets, of fish or of crustaceans, molluscs or other aquatic invertebrates) (t).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.