HTS Heading 2302
Bran, sharps (middlings) and other residues, whether or not in the form of pellets, derived from the sifting, milling or other working of cereals or of leguminous plants
All 8 HTS codes under heading 2302 (bran), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.4%.
Every line of heading 2302
- 2302 Bran, sharps (middlings) and other residues, whether or not in the form of pellets, derived from the sifting, milling or other working of cereals or of leguminous plants.
- 2302.10.00.00 Of corn (maize) (under: Bran, sharps (middlings) and other residues, whether or not in the form of pellets, derived from the sifting, milling or other working of cereals or of leguminous plants) (t): General Free; Special none; Column 2 10%.
- 2302.30.00 Of wheat (under: Bran, sharps (middlings) and other residues, whether or not in the form of pellets, derived from the sifting, milling or other working of cereals or of leguminous plants): General Free; Special none; Column 2 10%.
- 2302.30.00.10 Bran, shorts and middlings (under: Of wheat) (t).
- 2302.30.00.90 Other (under: Of wheat) (t).
- 2302.40.01 Of other cereals (under: Bran, sharps (middlings) and other residues, whether or not in the form of pellets, derived from the sifting, milling or other working of cereals or of leguminous plants): General Free; Special none; Column 2 10%.
- 2302.40.01.05 Of rice (under: Of other cereals) (t).
- 2302.40.01.10 Of other single cereal grains, chopped, crushed or ground (t).
- 2302.40.01.20 Pelletized screenings (clearings) (t).
- 2302.40.01.90 Other (under: Other) (t).
- 2302.50.00.00 Of leguminous plants (under: Bran, sharps (middlings) and other residues, whether or not in the form of pellets, derived from the sifting, milling or other working of cereals or of leguminous plants) (t): General 1.4%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.