HTS Heading 2701

Coal; briquettes, ovoids and similar solid fuels manufactured from coal

All 6 HTS codes under heading 2701 (coal), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2701

  • 2701 Coal; briquettes, ovoids and similar solid fuels manufactured from coal.
  • 2701.11.00.00 Anthracite (under: Coal, whether or not pulverized, but not agglomerated) (t): General Free; Special none; Column 2 Free.
  • 2701.12.00 Bituminous coal (under: Coal, whether or not pulverized, but not agglomerated): General Free; Special none; Column 2 Free.
  • 2701.12.00.10 Metallurgical coal (under: Bituminous coal) (t).
  • 2701.12.00.50 Other (under: Bituminous coal) (t).
  • 2701.19.00 Other coal (under: Coal, whether or not pulverized, but not agglomerated): General Free; Special none; Column 2 Free.
  • 2701.19.00.10 Sub-bituminous coal (under: Other coal) (t).
  • 2701.19.00.50 Other (under: Other coal) (t).
  • 2701.20.00.00 Briquettes, ovoids and similar solid fuels manufactured from coal (t): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.