HTS Heading 2702
Lignite, whether or not agglomerated, excluding jet
All 2 HTS codes under heading 2702 (lignite, whether or not agglomerated), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2702
- 2702 Lignite, whether or not agglomerated, excluding jet.
- 2702.10.00.00 Lignite, whether or not pulverized, but not agglomerated (t): General Free; Special none; Column 2 Free.
- 2702.20.00.00 Agglomerated lignite (under: Lignite, whether or not agglomerated, excluding jet) (t): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.